Skip to content

Coal supply · Logistics · Since 1983

Central India’s coal partner.Four decades of trust.

Domestic and imported coal delivered PAN India from WCL, SECL and SCCL command areas — with the consistency, compliance and tonnage that industrial buyers actually need.

Established
1983
Command areas
WCL · SECL · SCCL
Delivery
PAN India, road mode
Supplied, FY 2025-26
250,000 MT

42+ yrs

In coal trading since 1983

250,000MT

Supplied in FY 2025-26

5yards

Across Central & South India

PAN India

Road-mode delivery footprint

Direct relationships across the country’s largest coal producers.

  • WCL
  • SECL
  • SCCL
  • MCL
  • Imported · Indonesia / South Africa
Map of Harsha Techno Finserv’s coal yards across Maharashtra (Nagpur dispatch hub, Wani, Chandrapur), Chhattisgarh (Bilaspur) and Telangana (Hyderabad).ChhattisgarhMaharashtraTelanganaNagpurWaniChandrapurBilaspurHyderabad
Five coal yards across Maharashtra, Chhattisgarh & Telangana — Nagpur is the dispatch hub.

Logistics network

Five coal yards. One coordinated dispatch desk.

We move coal from pithead to plant gate with the paperwork pre-cleared and the truck on time — not as a promise, as a process.

  • Nagpur
  • Wani
  • Chandrapur
  • Bilaspur
  • Hyderabad
See our logistics network

How we work

From enquiry to plant gate, one accountable desk.

No call centre, no hand-offs — a single dispatch desk owns your order end to end.

01

Share your spec

Tell us the grade, GCV, tonnage and plant location — by form, phone or email.

02

Quote within 24 hours

A documented quote with grade, verified GCV and delivered pricing. One accountable owner.

03

Scheduled dispatch

Loading from the nearest yard, weighbridge-documented, against a confirmed purchase order.

04

Delivered, papers clean

Road-mode delivery PAN India with retained samples and GST-clean, statutory invoicing.

Industries served

Grade-matched coal for the plants that run Central India.

We supply to the boiler and the budget — the right grade, from the right source, scheduled to your consumption.

Thermal Power

Consistent calorific value, dispatch after dispatch.

Cement

Kiln-grade tonnage that holds its spec.

Steel & Sponge Iron

Sized, high-GCV coal for reduction and heat.

Textiles

Reliable process steam for continuous lines.

Paper & Pulp

Steady firing for recovery and power boilers.

Pharma & Chemicals

Batch-grade supply, scheduled to the campaign.

Quality & compliance

The part procurement teams actually lose sleep over.

Third-party lab GCV verification

Independent laboratory testing on every consignment, with samples retained for reference.

Documented weighbridge & dispatch trail

Pithead-to-plant paperwork, transparent weighbridge logs and GST-clean invoicing.

100 MT minimum — quoted, scheduled, delivered

From confirmed PO to unloading, one desk owns the schedule and the truck-on-time promise.

Knowledge base

Know your coal before you buy it.

Plain-English guides on grades, calorific value, sourcing and logistics — written for procurement and plant teams.

All guides

Common questions

What procurement teams ask before the first PO.

If your question isn't here, the dispatch desk will answer it on the quote.

What is the minimum order quantity?
Our minimum order quantity is 100 MT. Orders are quoted, scheduled and delivered against a confirmed purchase order.
Which coal grades do you supply?
ROM, steam and slack grades from GCV 3,500 to 5,000 kcal/kg, both domestic and imported. Steam coal is the workhorse grade for power, cement and steel buyers.
Do you supply both domestic and imported coal?
Yes. The bulk of our supply is domestic coal from WCL, SECL and SCCL command areas. When domestic supply is tight or specifications demand a lower-ash product, we source imported coal from Indonesia and South Africa.
How is GCV verified?
GCV is verified through third-party laboratory testing, with retained samples and a documented weighbridge and dispatch trail accompanying every consignment.
What geographies do you deliver to?
We deliver PAN India by road mode from five yards — Nagpur, Wani, Bilaspur, Hyderabad and Chandrapur — coordinated by a single dispatch desk.
How do you help with grade selection?
Tell us what your plant runs on — boiler type, current grade and consumption — and we recommend the grade and source that match your spec and budget, then quote against it.
Can samples be tested before a bulk order?
Yes. Sample testing ahead of a bulk commitment is supported, with results from an independent laboratory and samples retained for reference.
What are your payment and lead-time terms?
Lead time and payment terms are confirmed on the quote against your location and tonnage. Central India is typically the fastest lane, with South and North/East scheduled accordingly.

Tell us what your plant runs on. We'll quote in 24 hours.

Domestic or imported, ROM to washed steam grades — one desk owns your enquiry from quote to unloading.

Request a Quote
CallGet a Quote